In this scope of work, the followings are manufactured and mounted: 58,000 m³ excavation, 14,000 m³ B.A Curtain and Base, 115 ad L = 18,40 m prestressed bridge beam The side roads of the junction were reconstructed. - 487 m Ø 1,400 drinking water pipeline has been displaced. - 435 m Ø (2,00 x 1,80) Waste water Box - 475 m Ø (2,00 x 1,50) Rainfall Box - 1,240 m Ø 800 Rain water canal. 2,788 m Rainwater collector, 385 m Ø 1,400 mm steel drinking water pipe, Vehicle underpass and lighting of the junction, Junction landscaping, traffic signs and signalization
COUNTRY | Turkey |
CITY | Konya |
PROJECT NAME | Construction of Underpass and flyover junction at Mevlana Intersection |
THE PROJECT OF THE YEAR | 2018 |
DETAIL | Construction of Underpass and flyover junction at Mevlana Intersection |