Sub-base course Graywacke Filler, Crushed Stone Substratum (PLENT-MIX), Road Coating Concrete (with Wire Mesh), Concrete Border and Paving Stone Trottoirs, 330,000 m³ Excavation, 700 m² (230 m length) Reinforced Earth Wall, 2,200 m³ (450 m length) Stone Wall, 2,600 m. (300/200 cm. B.A. Closed section, 700/250 cm. and 1,000/250 cm. B.A. Open Section) B.A. Stream Remediation, 6,900 m. (between ø300 mm. and ø2,200 mm.) Wastewater and Rainwater line
COUNTRY | Turkey |
CITY | Istanbul |
PROJECT NAME | Istanbul Nato Road - Küçüksu Connection Continue Road and Common Infrastructure Construction |
THE PROJECT OF THE YEAR | 2017 |
DETAIL | Istanbul Nato Road - Küçüksu Connection Continue Road and Common Infrastructure Construction |