Road with total length 3,460 m, width 18 m (2x2 lane), B.A. bridge with 208 m Prestressed Beam, 1,100 m (600/200 cm, 1,200/200 cm) B.A. Stream Rehabilitation, Total 15,697 m. Wastewater and Rainwater line from Ø300 mm to Ø2200 mm, and ø100 mm, ø150 mm, ø250 mm Drinking Water Line, PTT Infrastructure and Lines. 299,231 m³ Excavation, 133,750 m³ GrayWacke Filling, 414.65 m³ Stone Filling, 39,856m³ Sand Filling, 80,932 m³ Crushed Rock Substratum, 10,957 m³ Plentmix Base. Total 29,500 m ø80 cm and ø65 cm Bored Pile, Total 7,950 m² (1,218 m in length) Reinforced Earth Wall, 7,804 m³ (627 m in length) Stone Wall,
COUNTRY | Turkey |
CITY | Istanbul |
PROJECT NAME | Istanbul ABC Road and Intersection |
THE PROJECT OF THE YEAR | 2017 |
DETAIL |